Management activities for construction of a dike

  • Carmen Nicoleta Debeleac Dunarea de Jos University of Galati
##plugins.pubIds.doi.readerDisplayName##: https://doi.org/10.35219/ann_udjg_im.2021.1.02

Résumé

The dike is an engineering construction and is a component part of the hydrotechnical arrangements. A case study regarding the management of the construction activities of a dike is described in this paper. Alternative mechanization options are presented, and their selection criteria were to fit into the execution period and financial efficiency. In this sense, a calculation of premeasurements, required construction machines, number of hours of their operation, specific fuel consumption, working days for each activity is presented.

Publiée
2024-01-19
Comment citer
1.
Debeleac C. Management activities for construction of a dike. Analele Universităţii "Dunărea de Jos" din Galaţi. Fascicula XIV, Inginerie mecanică = Annals of “Dunarea de Jos“ University of Galati. Fascicle XIV, Mechanical Engineering [Internet]. 19janv.2024 [cité 15août2026];28(1):9-2. Available from: https://www.gup.ugal.ro/ugaljournals/index.php/im/article/view/6421
Rubrique
Articles